Cutting concrete

Code code, I love to code. But, there are other codes that one must adhere to. Permitted and planned. Takes awhile longer perhaps, at more expense, but it increases the utility of the space and hopefully will prevent hassle in the long run.

In order to properly support the walls of the office, we need to put a footing in first. This requires cutting through the floor.

 

 

This entry was posted in Break, Ranch. Bookmark the permalink.

Leave a Reply