Finished footings and rough plumb

Rebar in and footing set. Now to let it dry and then build it up.

There will be a special floor drain with a slow drip (source feeder copper line is covered by the blue sheath, and drain is covered by foil tape in preparation for the concrete pour). This way, the trap below the floor drain will not entirely evaporate and vent the sewer into the bathroom.

This entry was posted in Build, Ranch. Bookmark the permalink.

Leave a Reply